Protect federal investment in the I-5 Bridge Replacement Project and keep the project on track.

Patty Murray · Washington · Democratic

spending impact 0.70 specificity 0.80 extraction confidence 82%

Commitment kind: unknown. Promised action: not established. Promised outcome: not established. Deadline: unknown; not assumed expired.

Contest this claim

Occurrences

Evidence

unverified · Source version 43379 · locator unknown

The IBR Program said FHWA and FTA issued an Amended Record of Decision on July 1, 2026, completing federal NEPA review. The approval lets Washington and Oregon move toward construction, begin contractor identification, secure permits, and advance a first funded phase with $5.7 billion in available local, state, and federal funding.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Within the lookback window, federal approval moved the I-5 bridge replacement from environmental review toward construction and tied the next phase to available funding.

partial same_term

Amended Record of Decision | Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 97%

Contest this evidence item

unverified · Source version 43380 · locator unknown

The program states it has approximately $5.7 billion in committed funding for the first phase, including the replacement bridge and I-5 connections. It also says the July 1 Amended Record of Decision clears steps needed to initiate construction, but bridge construction is currently anticipated to begin in 2028.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The project appears on track for a funded first phase, but construction has not started and procurement/remaining grant obligations are still ahead.

partial same_term

Advancing to Construction | Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 95%

Contest this evidence item

unverified · Source version 87915 · locator unknown

The program lists committed funding including a $600 million Mega grant and a $1.5 billion FHWA Bridge Investment Program grant. It also reports a 2026 likely full-corridor cost of $14.4 billion, with future federal grant options and other funding still being pursued.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Major federal investment has been secured and preserved in the funding plan, but the full corridor still has a funding gap and future phases remain dependent on additional money.

partial same_term

Cost Estimate & Funding | Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 95%

Contest this evidence item

unverified · Source version 43382 · locator unknown

The IBR Program announced it received $1.499 billion through FHWA's Bridge Investment Program to help construct the replacement bridge and corridor improvements. The program said the grant was announced by congressional offices and followed a $600 million Mega grant.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Official project records confirm a large federal bridge grant during Murray's current Senate term, strengthening the federal investment component of the commitment.

partial same_term

IBR program awarded $1.499 billion FHWA Bridge Investment Program grant | Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 94%

Contest this evidence item

unverified · Source version 43383 · locator unknown

AP reported that Sens. Maria Cantwell and Patty Murray and Rep. Marie Gluesenkamp Perez announced $600 million in federal funds for the replacement. AP also reported Murray had advocated for the project for decades and considered it a top priority.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): This ties Murray personally to securing federal investment for the I-5 bridge replacement during the relevant Senate term.

partial same_term A for effort

$600M in federal funding to go toward replacing I-5 bridge connecting Oregon and Washington
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

unverified · Source version 43384 · locator unknown

AP reported that Transportation Secretary Pete Buttigieg visited the I-5 bridge after Murray invited him, and that federal funding, including $600 million from the infrastructure law, supported the replacement project.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Murray took concrete action to elevate the project with USDOT leadership, supporting an effort badge even though the bridge was not yet under construction.

partial same_term A for effort

Buttigieg visits interstate highway bridge in Pacific Northwest slated for seismic replacement
secondary · model gpt-5.5 · confidence 88%

Contest this evidence item

verified · Source version 87914 · locator 1726

Request for qualifications addendum 3 (PDF 400KB) - posted 9/18/2026

Fetched verbatim passage. AI summary (separate from source): Within the lookback window, WSDOT continued active procurement for the Columbia River Bridge Replacement contract, indicating the federally funded first construction phase remained on track rather than blocked or abandoned.

delivered same_term

Columbia River Bridge Replacement | WSDOT
secondary · model gpt-5.5 · confidence 93%

Contest this evidence item

verified · Source version 64252 · locator 2520

Procurement is underway for the new Columbia River bridge!

Fetched verbatim passage. AI summary (separate from source): The official project homepage posted an August 24, 2026 update inside the lookback window showing procurement had moved forward after federal approval.

delivered same_term

Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 94%

Contest this evidence item

verified · Source version 64254 · locator 992

The Interstate 5 Bridge Bi-State Tolling Subcommittee will be holding a virtual meeting on September 18, 2026.

Fetched verbatim passage. AI summary (separate from source): A project governance and tolling meeting occurred during the lookback window, supporting that funding and implementation work continued rather than stalled.

partial same_term

Bi-state Tolling Subcommittee | Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 82%

Contest this evidence item

verified · Source version 64256 · locator 8512

Those actions grant licenses, permits, and approvals for the project.

Fetched verbatim passage. AI summary (separate from source): Federal Register notice confirms FHWA and FTA final agency actions granted approvals for the I-5 corridor project, clearing a central federal milestone in Murray's current term.

delivered same_term

Federal Register :: Notice of Final Federal Agency Actions on Proposed Interstate Bridge Replacement Program in Portland, Oregon and Vancouver, Washington
secondary · model gpt-5.5 · confidence 96%

Contest this evidence item

unverified · Source version 64258 · locator unknown

Interstate Bridge Replacement Project | OR/WA | $1,499,000,000

Unverified model/legacy excerpt; not proof. AI summary (separate from source): FHWA's official recipient table documents the major federal Bridge Investment Program award that protected federal investment for the I-5 bridge replacement during Murray's Senate term.

delivered same_term

BIP - Funding Programs - Management and Preservation - Bridges & Structures - Federal Highway Administration
secondary · model gpt-5.5 · confidence 97%

Contest this evidence item

unverified · Source version 64260 · locator unknown

will you commit to publishing the Record of Decision for the IBR project no later than July 1^{st}?

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Murray directly pressed USDOT on the July 1 Record of Decision benchmark; the later federal approval and procurement updates show that effort aligned with keeping the project on track.

partial same_term A for effort

Senator Murray Questions Secretary Duffy on Corporate-Paid Reality TV Road Trip as Americans Pay Sky-High Gas Prices - Senator Patty Murray
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

verified · Source version 87914 · locator 1419

Conformed request for qualifications (PDF 699KB) - posted 10/6/2026

Fetched verbatim passage. AI summary (separate from source): WSDOT's official contracting page shows a new conformed RFQ and submitters list posted October 6, 2026, indicating procurement continued after the September 30 submittal deadline rather than being blocked or abandoned.

delivered same_term

Columbia River Bridge Replacement | WSDOT
secondary · model gpt-5.5 · confidence 94%

Contest this evidence item

verified · Source version 87915 · locator 5254

With approximately $5.7 billion in committed funding, the Program can continue moving forward toward construction of the replacement bridge and connections to I-5 while the remaining funding is secured to complete construction of the core set of projects, including pursuing funding for light rail.

Fetched verbatim passage. AI summary (separate from source): The official project funding page directly confirms committed funding for a first phase and says the program can keep moving toward construction of the replacement bridge and I-5 connections, supporting delivery of the promise to protect federal investment and keep the project on track while later phases remain pending.

delivered same_term

Cost Estimate & Funding | Interstate Bridge Replacement Program
secondary · model gpt-5.5 · confidence 93%

Contest this evidence item

verified · Source version 103231 · locator 216

Submitter: Columbia River Constructors a JV

Fetched verbatim passage. AI summary (separate from source): WSDOT's complete submitters list identifies one joint venture, comprising Kiewit, Atkinson and Traylor. This adds substantive detail to the existing evidence about the list's publication: procurement attracted a submission, but the record does not establish a contract award. No newer procurement posting was found for October 29–31.

partial same_term

CRBRSubmittersList.pdf
primary · model gpt-6.1-sol · confidence 96%

Contest this evidence item

unverified · Source version 103233 · locator unknown

Filing 1 COMPLAINT for Declaratory and Injunctive Relief

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The reproduced federal docket records Iron Partners' October 6 administrative-law challenge naming FHWA, FTA, USDOT and federal officials. This documents litigation risk absent from the existing evidence, rather than an established reversal or construction injunction. The mirror was last retrieved October 6; its current disposition could not be verified, and no order halting the project was found in this search.

unresolved same_term

Iron Partners LLC v. Volcy et al — Western District of Washington docket
secondary · model gpt-6.1-sol · confidence 88%

Contest this evidence item

verified · Source version 108755 · locator 6725

This work is fully funded with the approximately $5.7 billion in currently committed funding.

Fetched verbatim passage. AI summary (separate from source): The official program newsletter confirms that the first construction phase remains funded. It schedules the request for proposals for late November, design-builder selection for spring 2027, and construction for 2028. This supports continued delivery of the investment-protection commitment, while documenting remaining implementation steps. Light rail construction still requires additional funding, including a sought $1 billion FTA grant; the newsletter does not establish that grant was awarded.

delivered same_term

October Newsletter: Fieldwork ramps up ahead of construction
primary · model gpt-6.1-sol · confidence 95%

Contest this evidence item

verified · Source version 108757 · locator 994

The Interstate Bridge Replacement Program is conducting fieldwork to prepare for the future replacement of the Interstate Bridge.

Fetched verbatim passage. AI summary (separate from source): The official project update documents preparatory fieldwork and plans for 16 river borings between November and February to inform bridge-support design. This provides additional evidence of implementation activity, although the page does not confirm completion of the borings or the start of bridge construction.

partial same_term

Ongoing Fieldwork Beginning in Fall 2026 | Interstate Bridge Replacement Program
secondary · model gpt-6.1-sol · confidence 94%

Contest this evidence item

verified · Source version 115376 · locator 4905

The Request for Proposals is expected to be published Nov. 23, with contract award anticipated in 2027 and construction beginning in 2028.

Fetched verbatim passage. AI summary (separate from source): The official announcement names a permanent program administrator and supplies a specific November 23 procurement target. This documents continued implementation during the lookback window; the contract award and construction remain prospective.

partial same_term

Program strengthens leadership team | Interstate Bridge Replacement Program
secondary · model gpt-6.1-sol · confidence 97%

Contest this evidence item

unverified · Source version 115378 · locator unknown

WSDOT is initiating a two-step qualifications-based selection process for consultant services related to Interstate Bridge Replacement Program - Independent Cost Estimate.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): WSDOT advertised a new procurement for independent cost estimating, with submissions due November 25. The solicitation anticipates approximately $3 million over five years to evaluate design-builder estimates and negotiate pricing. This is concrete preparation for project delivery, with no consultant award yet established.

partial same_term

2026-Bridge-Replacement-Cost-Estimate-RFP.pdf
secondary · model gpt-6.1-sol · confidence 96%

Contest this evidence item

unverified · Source version 115380 · locator unknown

Interstate Bridge Replacement (IBR) Program WSDOT Vancouver/Portland WA-OR PD

Unverified model/legacy excerpt; not proof. AI summary (separate from source): FTA continues to list IBR in Project Development, with a $1 billion CIG funding request, matching funds still in progress, and an estimated grant date of early 2028. This confirms that the additional transit grant remains unresolved; it does not establish cancellation or withdrawal of the existing bridge awards.

unresolved same_term

FTA Capital Investment Grants Dashboard — updated November 5, 2026
secondary · model gpt-6.1-sol · confidence 96%

Contest this evidence item

verified · Source version 115382 · locator 7699

On Sept. 24, the Program received obligation of $546 million of the $1.5 billion federal Bridge Investment Program grant for preliminary engineering and right-of-way.

Fetched verbatim passage. AI summary (separate from source): The October official report adds a material fact absent from existing evidence: $546 million of the previously announced federal bridge award was obligated September 24. Although the obligation predates the lookback window, it strengthens evidence that federal investment was secured for implementation. It does not establish obligation of the entire award.

delivered same_term

InterstateBridgeReplacementProgram_Quarterly_Report_Oct_2026.pdf
secondary · model gpt-6.1-sol · confidence 98%

Contest this evidence item

Assessments

Public state: unverified As of unknown · legacy_unverified · . Original AI recommendation (not independently established): delivered. same_term

Murray can receive federal-office credit because the project secured major federal awards during her Senate term, including the $600 million Mega grant and about $1.5 billion Bridge Investment Program grant, and she was publicly tied to advocacy and announcements for the project. Federal NEPA review was completed on July 1, 2026, allowing the project to move toward construction with a funded first phase. Although full corridor funding and actual construction remain ahead, the promise was framed as protecting federal investment and keeping the project on track, not completing the bridge, so the available evidence supports delivery in the same term.

provider codex_cli · model gpt-5.5 · confidence 86%