Work to expand the use of coal-derived CO2 for enhanced oil recovery in the Bakken to increase oil production.

John Hoeven · North Dakota · Republican

policy impact 0.75 specificity 0.85 extraction confidence 96%

Commitment kind: action. Promised action: Work with partners to expand enhanced oil recovery to field-scale testing in the Bakken.. Promised outcome: Increased Bakken oil production through expanded enhanced oil recovery.. Deadline: unknown; not assumed expired. Phase two of Crack the Code 2.0 would include up to 200 field test wells, prioritizing proximity to an existing CO2 source and infrastructure.

Contest this claim

Occurrences

We are bringing together the partnerships we need for phase two, with the goals of increasing oil production by moving from individuals wells to using EOR in a whole oil field, providing additional revenue streams for our coal producers, developing domestic sources of rare earth elements and increasing fertilizer production.

Hoeven repeats his commitment to advancing enhanced oil recovery from individual wells to an entire oil field as part of phase two.

Hoeven: Efforts Begin on Phase 2 of Crack the Code 2.0, Moving From Individual Wells to Field-Scale Testing
primary · press_release · model gpt-6.1-sol

Evidence

unverified · Source version 3631 · locator unknown

first phase is funded and underway

Unverified model/legacy excerpt; not proof. AI summary (separate from source): In the lookback window, Hoeven’s office said Crack the Code 2.0 phase one is funded and underway, with pilot work aimed at Bakken EOR and future coal-plant CO2 use.

partial unknown A for effort

Hoeven Working to Advance Coal-Based Fertilizer & Critical Mineral Production Under Second Phase of Crack the Code 2.0
primary · model gpt-5.5 · confidence 86%

Contest this evidence item

verified · Source version 63302 · locator 4687

researchers will use produced gas from existing oil operations

Fetched verbatim passage. AI summary (separate from source): UND/EERC described phase one as pilot-scale EOR using produced gas first, with captured CO2 from coal-fired power plants framed as the long-term vision rather than completed deployment.

unresolved unknown A for effort

EERC carbon capture research looks to unlock more of the Bakken - UND Today
secondary · model gpt-5.5 · confidence 88%

Contest this evidence item

verified · Source version 87588 · locator 7762

DOE’s investment of $36 million

Fetched verbatim passage. AI summary (separate from source): DOE selected UND EERC for federal funding for Bakken EOR-CC, a multi-pilot program meant to advance commercial deployment of carbon-dioxide-based EOR in the Bakken.

partial unknown A for effort

Energy Department to Invest $36 Million in Enhanced Oil Recovery Program at the University of North Dakota | Department of Energy
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

verified · Source version 63306 · locator 9036

standardized the base credit amount at $17 per metric ton

Fetched verbatim passage. AI summary (separate from source): IRS guidance confirms Public Law 119-21 changed section 45Q treatment for carbon oxide uses, supporting the incentive side of Hoeven’s coal-to-EOR strategy.

partial unknown

Instructions for Form 8933 (12/2025) | Internal Revenue Service
secondary · model gpt-5.5 · confidence 82%

Contest this evidence item

verified · Source version 63308 · locator 506

Mr. Hoeven, Mr. Justice, and Mr. Sheehy introduced

Fetched verbatim passage. AI summary (separate from source): GovInfo records Hoeven as an original co-sponsor of S. 425, which sought 45Q parity for carbon oxide uses including enhanced oil recovery, documenting concrete legislative effort.

unresolved unknown A for effort

S. 425 (IS) - Enhancing Energy Recovery Act
secondary · model gpt-5.5 · confidence 84%

Contest this evidence item

verified · Source version 63310 · locator 6622

Funded Amount: $5,000,000

Fetched verbatim passage. AI summary (separate from source): North Dakota Industrial Commission records show state funding for an EERC project to evaluate infrastructure to capture, transport, and deliver CO2 for Bakken EOR.

partial unknown A for effort

Lignite Research Program-Grant Rounds 109-100 | North Dakota Industrial Commission
secondary · model gpt-5.5 · confidence 83%

Contest this evidence item

verified · Source version 102815 · locator 2752

developing the infrastructure to get it to Bakken oil fields could take several years.

Fetched verbatim passage. AI summary (separate from source): Within the lookback window, EERC said Bakken CO2 EOR still requires CO2 supply and infrastructure development, indicating coal-derived CO2 use has not yet reached broad deployment.

unresolved same_term A for effort

Extending the Life of the Bakken
primary · model gpt-5.5 · confidence 90%

Contest this evidence item

unverified · Source version 3631 · locator unknown

the first phase is funded and underway

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Hoeven’s office reported that Crack the Code 2.0 phase one is underway and tied it to future coal-plant CO2 use for Bakken EOR, supporting partial progress but not completed expansion.

partial same_term A for effort

Hoeven Working to Advance Coal-Based Fertilizer & Critical Mineral Production Under Second Phase of Crack the Code 2.0
primary · model gpt-5.5 · confidence 88%

Contest this evidence item

verified · Source version 75107 · locator 6591

include qualified carbon oxide that is used as a tertiary injectant

Fetched verbatim passage. AI summary (separate from source): IRS Notice 2026-50 expanded section 45Q safe-harbor treatment to carbon oxide used in qualified EOR projects, an implementation step relevant to the incentive side of the commitment.

partial same_term

Internal Revenue Bulletin: 2026-36 | Internal Revenue Service
secondary · model gpt-5.5 · confidence 82%

Contest this evidence item

verified · Source version 87588 · locator 4962

$36 million in federal funding

Fetched verbatim passage. AI summary (separate from source): DOE selected UND EERC for Bakken EOR-CC funding to generate data for large-scale carbon-dioxide-based EOR, a concrete federal investment toward the promise.

partial same_term A for effort

Energy Department to Invest $36 Million in Enhanced Oil Recovery Program at the University of North Dakota | Department of Energy
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

unverified · Source version 75110 · locator unknown

used by the taxpayer as a tertiary injectant in a qualified enhanced oil or natural gas recovery project

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Public Law 119-21 amended section 45Q to include qualified carbon oxide used as an EOR tertiary injectant, partially delivering a federal incentive framework for CO2 EOR.

partial same_term

Public Law 119-21
secondary · model gpt-5.5 · confidence 86%

Contest this evidence item

verified · Source version 63310 · locator 6271

evaluate the infrastructure needed to capture, transport, and deliver carbon dioxide

Fetched verbatim passage. AI summary (separate from source): North Dakota Industrial Commission records show a funded EERC project for CO2 capture, transport, and delivery infrastructure for Bakken EOR, documenting enabling work short of completed deployment.

partial same_term A for effort

Lignite Research Program-Grant Rounds 109-100 | North Dakota Industrial Commission
secondary · model gpt-5.5 · confidence 83%

Contest this evidence item

verified · Source version 87585 · locator 6506

Fully realizing the Bakken’s EOR potential will therefore require bringing large volumes of CO₂ to western North Dakota.

Fetched verbatim passage. AI summary (separate from source): In the lookback window, UND/EERC said commercial-scale Bakken CO2 EOR still requires major CO2 supply, indicating coal-derived CO2 use has not yet been broadly deployed.

unresolved same_term A for effort

Cracking the code: extending the life of one of America’s most important oil plays - UND Today
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

verified · Source version 87585 · locator 7196

The next phase of Cracking the Code 2.0 will build on this work by examining the infrastructure needed to deliver CO₂ from sources such as coal-fired power plants to producing oil fields.

Fetched verbatim passage. AI summary (separate from source): UND/EERC described the coal-plant CO2-to-oil-fields work as an infrastructure-planning next phase, supporting concrete effort but not completed delivery.

partial same_term A for effort

Cracking the code: extending the life of one of America’s most important oil plays - UND Today
secondary · model gpt-5.5 · confidence 88%

Contest this evidence item

verified · Source version 87587 · locator 2776

Chord had to adjust from a CO2 injection plan to a mostly a hydrocarbon based injectable solution due to lack of available CO2 supply.

Fetched verbatim passage. AI summary (separate from source): A North Dakota Industrial Commission proposal documented that a Bakken pilot shifted away from CO2 injection because adequate CO2 supply was unavailable, showing a concrete obstacle to delivery.

unresolved same_term A for effort

G-62-L-Large-Scale-Hydrocarbon-Gas-Injection-EOR-P.pdf
secondary · model gpt-5.5 · confidence 92%

Contest this evidence item

verified · Source version 87588 · locator 4962

$36 million in federal funding for the University of North Dakota’s Energy & Environmental Research Center to advance the commercial deployment of enhanced oil recovery (EOR) technologies in the Bakken shale formation.

Fetched verbatim passage. AI summary (separate from source): DOE selected UND EERC for federal Bakken EOR-CC funding, a concrete federal investment toward CO2-based EOR deployment in the Bakken.

partial same_term A for effort

Energy Department to Invest $36 Million in Enhanced Oil Recovery Program at the University of North Dakota | Department of Energy
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

verified · Source version 75107 · locator 6591

include qualified carbon oxide that is used as a tertiary injectant in a qualified enhanced oil or natural gas recovery project

Fetched verbatim passage. AI summary (separate from source): IRS guidance implemented a 45Q safe-harbor expansion for carbon oxide used as an EOR tertiary injectant, supporting the incentive side of the commitment but not proving Bakken deployment.

partial same_term

Internal Revenue Bulletin: 2026-36 | Internal Revenue Service
secondary · model gpt-5.5 · confidence 84%

Contest this evidence item

unverified · Source version 3631 · locator unknown

in the process of developing large-scale pilot projects to advance EOR in the Bakken, using CO2 from coal-fired power plants to increase the productivity of oil wells.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Hoeven’s office reported funded pilot work and phase-two planning tied to coal-plant CO2 for Bakken EOR, documenting effort while describing the work as still in process.

partial same_term A for effort

Hoeven Working to Advance Coal-Based Fertilizer & Critical Mineral Production Under Second Phase of Crack the Code 2.0
primary · model gpt-5.5 · confidence 86%

Contest this evidence item

verified · Source version 95969 · locator 4481

Hoeven is working with Haustveit to make this loan guarantee authority available to support the estimated $400 million cost

Fetched verbatim passage. AI summary (separate from source): Hoeven reported three Bakken EOR pilots underway and sought financing for a proposed expansion to as many as 200 wells near an existing CO2 source. This documents concrete effort during the lookback window, but financing remained pending and the release does not establish expanded coal-derived CO2 injection or resulting oil production.

unresolved unknown A for effort

Hoeven: Efforts Begin on Phase 2 of Crack the Code 2.0, Moving From Individual Wells to Field-Scale Testing
primary · model gpt-6.1-sol · confidence 96%

Contest this evidence item

verified · Source version 102815 · locator 5432

Rather, produced gas will answer the technical and operational questions that must be solved before large-scale CO₂ EOR can become practical in the Bakken.

Fetched verbatim passage. AI summary (separate from source): Immediately before the lookback window, the research organization explained that current demonstrations use produced hydrocarbon gas as a bridge to future CO2 EOR. Large CO2 supplies and delivery infrastructure could take years; infrastructure connecting coal-fired power plants to oil fields remained future work. This limits treating ongoing pilots as delivery of expanded coal-derived CO2 use.

unresolved unknown

Extending the Life of the Bakken
primary · model gpt-6.1-sol · confidence 97%

Contest this evidence item

Assessments

Public state: pending As of 2026-10-30 · verified · . Original AI recommendation (not independently established): unresolved. unknown A for effort

Hoeven’s verified financing work establishes effort toward the phase-two goals. Verified passages describe coal-derived CO2 infrastructure as future work and document a pilot switching to hydrocarbon gas because CO2 was unavailable. They do not establish completed field-scale CO2 expansion or increased oil production attributable to Hoeven. Funding and incentives alone do not prove that outcome. The verified commitment has no deadline, so ongoing work warrants unresolved rather than never.

provider codex_cli · model gpt-6.1-sol · confidence 97%