Data centers must pay their fair share to connect to and use the grid, and they should be required to use closed loop water systems.
Require data centers to pay their fair share to connect to and use the electric grid.
Occurrences
Rep. Larsen supports tough, upfront restrictions on data centers: No high electric bills for local families and small businesses; No federal tax breaks; No construction without community approval and union labor; Data centers must pay their fair share to connect to and use the grid; and Data centers must use closed loop water systems.
Evidence
unverified · Source version 101822 · locator unknown
Larsen (WA) | Larsen (WA) | Democratic | WA | Yea
verified · Source version 101824 · locator 896
Vote Result: Cloture on the Motion to Proceed Rejected
Assessments
The verified commitment seeks a grid-cost requirement, not merely introduction or a vote. The verified evidence records rejected Senate cloture and does not establish enactment or an attributable partial outcome. Larsen’s reported vote is unverified, so it cannot support material attribution or an effort badge. No documented deadline has expired.