Optimize the existing transmission system, including through grid-enhancing technologies;
Require transmission planners to optimize the existing transmission system, including through grid-enhancing technologies.
Occurrences
“(1) C OMMON SELECTION METHODOLOGY.—A methodology that— “(A) allows for the joint identification and selection, by any immediately adjacent Transmission Planning Region, of specific regional transmission facilities, interregional transmission facilities, and covered local transmission facilities for construction or modification, including through the use of advanced transmission conductors (including superconductors), reconductoring, and grid-enhancing technologies;