The legislation would prohibit the Department of Energy from issuing emergency orders that delay the retirement of power plants or require electric generation from facilities that have already been permanently closed.
Prohibit the Department of Energy from issuing emergency orders that delay power plant retirements or require generation from permanently closed facilities.
Occurrences
Full Title To modify the emergency authority under section 202(c) of the Federal Power Act to increase transparency for ratepayers and prohibit orders that prevent or delay the retirement of power plants.
Evidence
unverified · Source version 79409 · locator unknown
10/1/2026 | H.R. 10687 | To modify the emergency authority under section 202(c) of the Federal Power Act to increase transparency for ratepayers and prohibit orders ... that prevent or delay the retirement of power plants. Official Title To modify the emergency authority under section 202(c) of the Federal Power Act to increase transparency for ratepayers and prohibit orders that prevent or delay the retirement of power plants.Sponsor Rep. Mrvan, Frank J. [D-IN-1]Introduced October 1, 2026 Lastest Action October 1, 2026 - Referred to the House Committee on Energy and Commerce.
unverified · Source version 79411 · locator unknown
119-hr-10687 | 119 | hr | 10687 | To modify the emergency authority under section 202(c) of the Federal Power Act to increase transparency for ratepayers and prohibit orders that prevent or delay the retirement of power plants. | | 2026-10-01 | 2026-10-01 | Referred to the House Committee on Energy and Commerce. | House | Rep. Mrvan, Frank J. [D-IN-1] | IN | D | M001214 | 0 | | 2026-10-02T08:05:52Z | https://www.congress.gov/bill/119th-congress/house-bill/10687
unverified · Source version 90919 · locator unknown
Last Action Date Listed October 1, 2026 Action Mr. Mrvan introduced the following bill; which was referred to the Committee on Energy and Commerce Bill Number H.R. 10687 Bill Version Introduced in House (IH)
unverified · Source version 90922 · locator unknown
“(7) (A) Except as provided in subparagraph (B), the Commission may not issue an order under this subsection (including any renewal or reissuance of an order under this subsection) that would— “(i) prevent or delay the retirement or other permanent closure of a facility for the generation of electric energy; or “(ii) require the generation of electric energy at a facility that has retired or otherwise permanently closed.