Continue working toward final passage of the $7.5 million authorization for Jim Hogg County water infrastructure improvements and secure funding for the work.

Henry Cuellar · Texas · Democratic

spending impact 0.60 specificity 0.90 extraction confidence 99%

Commitment kind: action. Promised action: Continue working to advance final passage of the authorization and obtain funding for Jim Hogg County water infrastructure improvements.. Promised outcome: Final passage of the $7.5 million authorization and funding for the infrastructure improvements.. Deadline: unknown; not assumed expired. Commitment made as U.S. Representative for Texas’s 28th District. The authorization was included in WRDA 2026 and had passed the House Transportation and Infrastructure Committee; final passage and funding remained pending.

Contest this claim

Occurrences

Evidence

verified · Source version 101028 · locator 2247

I’ll keep working to move this authorization through final passage and secure the funding to get the job done.

Fetched verbatim passage. AI summary (separate from source): Within the lookback window, Cuellar explicitly described final passage and project funding as future work. His announcement does not establish enacted authorization or secured funding; the commitment remains unresolved.

unresolved same_term

Rep. Cuellar Secures $7.5 Million Authorization for Jim Hogg County Water Infrastructure | U.S. Congressman Henry Cuellar, Ph.D.
primary · model gpt-6.1-sol · confidence 99%

Contest this evidence item

unverified · Source version 101033 · locator unknown

Passed House amended Sept. 16, 2026; Roll No. 313: 415-9. Received in Senate Sept. 17, 2026.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The official calendar within the lookback window records H.R. 9497 as House-passed and received in the Senate. This establishes legislative progress, without final enactment or project funding.

unresolved same_term

House Calendars for October 9, 2026 - 119th Congress, 2nd Session-HISTORY OF BILLS AND RESOLUTIONS - HOUSE BILLS
secondary · model gpt-6.1-sol · confidence 99%

Contest this evidence item

unverified · Source version 101035 · locator unknown

Jim hogg county, texas.--$7,500,000 for water infrastructure, including distribution systems, in Jim Hogg County, Texas.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The House-passed bill contains the exact $7.5 million Jim Hogg County provision. Its inclusion documents concrete legislative progress, but a House-passed authorization bill does not establish enacted authorization or appropriated funding.

unresolved same_term A for effort

H.R. 9497 — Water Resources Development Act of 2026, Engrossed in House
primary · model gpt-6.1-sol · confidence 100%

Contest this evidence item

unverified · Source version 107113 · locator unknown

Cuellar | Democratic | TX | Yea

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Cuellar voted for House passage of H.R. 9497, which passed 415–9. This independently documents his concrete effort toward advancing the authorization, while final passage and funding remain unresolved.

unresolved same_term A for effort

Office of the Clerk, U.S. House of Representatives
primary · model gpt-6.1-sol · confidence 100%

Contest this evidence item

Assessments

Public state: unverified As of unknown · unverified · Source revision or retrieval eligibility changed; current packet requires reassessment.. Original AI recommendation (not independently established): unresolved. unknown

provider integrity · model deterministic · confidence 0%

Public state: pending As of 2026-10-28 · verified · . Original AI recommendation (not independently established): unresolved. unknown

The verified passage expresses future intent to advance final passage and secure funding; it does not document subsequent work, enacted authorization, secured funding, or material contribution to a completed outcome. The legislative progress and vote records are unverified and cannot establish delivery, partial credit, or an effort badge. No documented deadline supports a finding of never as of October 28, 2026.

provider codex_cli · model gpt-6.1-sol · confidence 99%