Continue working toward final passage of the $7.5 million authorization for Starr County water infrastructure improvements and flood risk studies for Roma and Escobares, and secure funding to carry out these provisions.

Henry Cuellar · Texas · Democratic

spending impact 0.65 specificity 0.90 extraction confidence 99%

Commitment kind: action. Promised action: Continue working to advance the Starr County water infrastructure authorization and Roma and Escobares flood risk study provisions through final passage and secure funding for their implementation.. Promised outcome: Funded water infrastructure improvements in Starr County and flood risk studies for Roma and Escobares.. Deadline: unknown; not assumed expired. Official congressional press release dated October 21, 2026, concerning WRDA 2026 provisions that had passed the House Transportation and Infrastructure Committee. Commitment made as the incumbent U.S. Representative for Texas’s 28th District.

Contest this claim

Occurrences

Evidence

verified · Source version 101029 · locator 2400

I’ll continue working to move these provisions through final passage and secure the funding needed to bring them to fruition.

Fetched verbatim passage. AI summary (separate from source): Within the lookback window, Cuellar explicitly described final passage and implementation funding as remaining work. This statement does not establish enactment or a funding award; the commitment remains unresolved.

unresolved unknown

Rep. Cuellar Secures $7.5 Million Authorization to Support Water Infrastructure in Starr County | U.S. Congressman Henry Cuellar, Ph.D.
primary · model gpt-6.1-sol · confidence 99%

Contest this evidence item

unverified · Source version 101038 · locator unknown

Passed House amended Sept. 16, 2026; Roll No. 313: 415–9. Received in Senate Sept. 17, 2026.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The official legislative history published within the lookback window records House passage and Senate receipt, with no subsequent enactment recorded in this edition. These procedural advances leave final passage unresolved.

unresolved unknown

CCAL-119hcal-2026-10-06-pt9.pdf
secondary · model gpt-6.1-sol · confidence 99%

Contest this evidence item

unverified · Source version 101035 · locator unknown

$7,500,000 for water and wastewater infrastructure, including water supply and distribution systems, in Starr County, Texas.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Section 307 includes the promised $7.5 million Starr County authorization. Section 201(a)(98) and (102) also includes flood risk management feasibility studies for Escobares and Roma. Their inclusion in the House-passed bill establishes legislative progress, but does not establish enacted authorization or appropriated funding.

unresolved unknown A for effort

H.R. 9497 — Water Resources Development Act of 2026, Engrossed in House
primary · model gpt-6.1-sol · confidence 99%

Contest this evidence item

unverified · Source version 107113 · locator unknown

Cuellar | Democratic | TX | Yea

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Cuellar voted for House passage of H.R. 9497, which passed 415–9. This documents concrete effort toward advancing the provisions; a House vote alone does not fulfill the final-passage and funding commitment.

unresolved unknown A for effort

Office of the Clerk, U.S. House of Representatives
primary · model gpt-6.1-sol · confidence 100%

Contest this evidence item

Assessments

Public state: unverified As of unknown · unverified · Source revision or retrieval eligibility changed; current packet requires reassessment.. Original AI recommendation (not independently established): unresolved. unknown

provider integrity · model deterministic · confidence 0%

Public state: pending As of 2026-10-28 · verified · . Original AI recommendation (not independently established): unresolved. unknown

The verified passage describes final passage and implementation funding as remaining work. It establishes intent but proves neither concrete follow-through nor a funded outcome attributable to Cuellar. The legislative and voting records are unverified and cannot support delivery, partial credit, or an effort badge. No documented deadline has expired as of October 28, 2026.

provider codex_cli · model gpt-6.1-sol · confidence 99%