Finish the wall.

Marlin A. Stutzman · Indiana · Republican

policy impact 0.91 specificity 0.92 extraction confidence 99%

Commitment kind: unknown. Promised action: not established. Promised outcome: not established. Deadline: unknown; not assumed expired.

Contest this claim

Occurrences

From day one, I have advocated to finish the wall on the southern border as soon as possible, and as your Congressman I will work to create a legal system that protects our citizens from the threats we already face and ensure that our national security is strengthened at every level.

Commits to finish the southern border wall as soon as possible.

Marlin for Congress
campaign · campaign_site · model gpt-5.4-mini

Evidence

unverified · Source version 7613 · locator unknown

"From day one, I have advocated to finish the wall on the southern border as soon as possible, and as your Congressman I will work ..."

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Stutzman explicitly campaigned on finishing the southern border wall.

never same_term

Marlin for Congress
campaign · model gpt-5.4-mini · confidence 95%

Contest this evidence item

unverified · Source version 67623 · locator unknown

H.R.816 was introduced on 01/28/2025 and referred to the Subcommittee on Border Security and Enforcement; the cosponsor list includes Rep. Stutzman, Marlin A. [R-IN-3] on 03/11/2025.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Stutzman took concrete legislative action supporting wall construction, but the bill stalled at introduction and referral.

never same_term A for effort

H.R.816 - Build the Wall Act of 2025 | Congress.gov
secondary · model gpt-5.4-mini · confidence 91%

Contest this evidence item

unverified · Source version 7630 · locator unknown

CBP says it has "more than 100 miles of new border wall and waterborne barrier funded with prior year appropriations in various stages of planning and construction."

Unverified model/legacy excerpt; not proof. AI summary (separate from source): As of the latest official CBP status page, the border wall system is still under construction and therefore not finished.

never same_term

Border Wall System Frequently Asked Questions | U.S. Customs and Border Protection
secondary · model gpt-5.4-mini · confidence 89%

Contest this evidence item

unverified · Source version 28403 · locator unknown

CBP says construction is only occurring on federally managed land in the IBWC floodplain, and the Laredo 3 Project includes wall panels and river buoys stretching across 25.1 acres and 56.4 miles of the Rio Grande.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Border-wall-related construction is still actively advancing in South Texas, indicating the wall has not been finished.

never same_term

'This is an attack on our town': Border wall reaches San Ygnacio
secondary · model gpt-5.4-mini · confidence 88%

Contest this evidence item

unverified · Source version 28404 · locator unknown

Laredo city leaders approved expanded right-of-entry access so CBP can conduct boundary surveys, soil sampling, geotechnical work, and appraisals for a proposed smart wall project, while saying the agreement does not allow construction or material storage.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Federal officials are still in the survey and planning phase for the barrier project, which is inconsistent with a finished wall.

never same_term

CBP gains access to Laredo riverfront property
secondary · model gpt-5.4-mini · confidence 82%

Contest this evidence item

unverified · Source version 28405 · locator unknown

CBP told Rep. Cuellar it does not agree with the Laredo flood-risk study and says it conducts hydraulic and hydrologic analyses before building barriers in floodplain areas; it also says the barrier system is engineered to withstand 100-year flood events.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The government is still engineering and defending a proposed barrier system, which shows the wall remains in progress rather than completed.

never same_term

CBP rejects Laredo study questioning Rio Grande barrier impacts
secondary · model gpt-5.4-mini · confidence 80%

Contest this evidence item

verified · Source version 54807 · locator 8997

Under Construction — Represents projects where border wall panels or waterborne barrier is currently being constructed/deployed. Completed — Represents the total mileage that has been completed since 1/20/2025.

Fetched verbatim passage. AI summary (separate from source): CBP's updated Smart Wall tracker still distinguishes completed mileage from substantial mileage under construction, so the southern border wall system was not finished as of the September 2026 refresh.

unresolved same_term

Smart Wall | U.S. Customs and Border Protection
secondary · model gpt-5.5 · confidence 91%

Contest this evidence item

unverified · Source version 54809 · locator unknown

On Sept. 14, six landowners and Conserve Big Bend, a nonprofit organization that focuses on preserving the region’s landscape, filed a lawsuit in a federal court in Washington, D.C.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): During the lookback window, a new federal lawsuit sought to halt Big Bend border infrastructure, showing active legal blockage and ongoing, unfinished wall-related work rather than completion.

unresolved same_term

What to know about possible border barriers in Big Bend
secondary · model gpt-5.5 · confidence 84%

Contest this evidence item

unverified · Source version 67622 · locator unknown

"construction is still paused inside Big Bend state and national parks"

Unverified model/legacy excerpt; not proof. AI summary (separate from source): A lookback-window report says Big Bend wall work was still paused in protected areas while other nearby work was only moving ahead, indicating the wall was not finished by the refresh date.

unresolved same_term

First segment of steel border wall goes up in Texas' Big Bend region - San Antonio Current
secondary · model gpt-5.5 · confidence 83%

Contest this evidence item

unverified · Source version 67623 · locator unknown

"Latest Action: House - 01/28/2025 Referred to the Subcommittee on Border Security and Enforcement. ... 03/11/2025 - Rep. Stutzman, Marlin A. [R-IN-3]"

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Congress.gov shows Stutzman cosponsored the Build the Wall Act of 2025, but the bill’s latest listed action remained committee referral rather than enactment.

unresolved same_term A for effort

H.R.816 - Build the Wall Act of 2025 | Congress.gov
secondary · model gpt-5.5 · confidence 91%

Contest this evidence item

unverified · Source version 79462 · locator unknown

"blocked further border barrier construction in the Big Bend region, approving an environmental group’s motion for a preliminary injunction."

Unverified model/legacy excerpt; not proof. AI summary (separate from source): A federal judge issued a preliminary injunction during the lookback window blocking Big Bend border barrier work while litigation continues, showing the wall commitment remains blocked and unresolved rather than delivered.

unresolved same_term

Judge halts border barrier construction in Big Bend
secondary · model gpt-5.5 · confidence 90%

Contest this evidence item

unverified · Source version 79464 · locator unknown

"As of September 30, 2026, CBP has completed: * 81.6 miles of 626 miles of planned new Primary Border Wall;"

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The latest indexed CBP Smart Wall status available in search shows only a fraction of planned new primary wall completed as of September 30, 2026, so the wall was not finished by the lookback refresh.

unresolved same_term

Mexico-United States border wall - Find at WIKI
secondary · model gpt-5.5 · confidence 84%

Contest this evidence item

unverified · Source version 90963 · locator unknown

“Defendants SHALL NOT build border barrier or related infrastructure, or engage in any construction or ground disturbing activities, in the Big Bend Sector until and unless Defendants comply with all applicable laws.”

Unverified model/legacy excerpt; not proof. AI summary (separate from source): A federal district court order blocked border barrier construction and related ground-disturbing work in the Big Bend Sector, showing the wall effort remained legally blocked and unfinished.

unresolved same_term

gov.uscourts.txwd.1172902145.66.0.pdf
secondary · model gpt-5.5 · confidence 94%

Contest this evidence item

unverified · Source version 90965 · locator unknown

“CBP estimates that it will incur at least $462,800 per day in suspension costs based on rough projections provided by the contractors.”

Unverified model/legacy excerpt; not proof. AI summary (separate from source): The government’s stay motion confirms the injunction was actively suspending CBP border barrier projects, with daily suspension costs, so the wall was not finished and remained contested.

unresolved same_term

gov.uscourts.txwd.1172902145.74.0.pdf
secondary · model gpt-5.5 · confidence 93%

Contest this evidence item

Assessments

Public state: unverified As of unknown · legacy_unverified · . Original AI recommendation (not independently established): never. same_term A for effort

Stutzman clearly promised to finish the southern border wall, but the outcome was not achieved during the relevant federal term. The strongest outcome evidence shows border barrier projects were still in planning or construction well into 2025 and 2026, so the wall was not finished. He did take concrete congressional action by cosponsoring the Build the Wall Act of 2025, which counts as a serious legislative effort, but that bill stalled and did not deliver the promised result. Under the federal office standard, this is a failed delivery with meaningful effort rather than partial or delivered.

provider codex_cli · model gpt-5.4 · confidence 93%

Public state: unverified As of unknown · legacy_unverified · . Original AI recommendation (not independently established): never. same_term A for effort

Stutzman promised to finish the southern border wall. The available evidence indicates the wall was not finished during the relevant term, with CBP describing additional wall and barrier work as still in planning and construction. Stutzman did make a concrete legislative effort by cosponsoring H.R.816, the Build the Wall Act of 2025, but that effort did not deliver the promised completed outcome.

provider codex_cli · model gpt-5.5 · confidence 91%