Stop mining and infrastructure projects that violate Indigenous treaty rights and further entrench our reliance on fossil fuels
Stop mining and infrastructure projects that violate Indigenous treaty rights and increase reliance on fossil fuels.
Occurrences
Evidence
legacy_unverified · Source version not recorded · locator unknown
Congress disapproves the Bureau of Land Management rule relating to Public Land Order No. 7917 for Withdrawal of Federal Lands; Cook, Lake, and Saint Louis Counties, MN, and the rule shall have no force or effect.
legacy_unverified · Source version not recorded · locator unknown
Enbridge completed the construction phase of the Line 3 Replacement Project and began operation of the new pipeline in October 2021. The project replaces and expands the capacity of the original Line 3 pipeline.
Assessments
The promised outcome was to stop covered mining and fossil-fuel infrastructure projects. The cited record shows the opposite on major examples: Enbridge Line 3 entered operation in October 2021 with expanded capacity, and Public Law 119-85 later nullified the 2023 Boundary Waters mineral withdrawal. Those outcomes mean the promise was not delivered, though the evidence indicates serious effort, so the effort badge applies.