Hold Big Tech accountable for energy costs driven by massive AI data centers.

Analilia Mejia · New Jersey · Democratic

oversight impact 0.72 specificity 0.84 extraction confidence 93%

Commitment kind: unknown. Promised action: not established. Promised outcome: not established. Deadline: unknown; not assumed expired.

Contest this claim

Occurrences

Evidence

legacy_unverified · Source version not recorded · locator unknown

The campaign platform says: "Big Tech companies are building massive AI data centers that use enormous amounts of energy, driving up costs for everyone else" and promises, "In Congress, I’ll hold Big Tech accountable. I’ll co-sponsor Bernie’s moratorium on new AI data centers, and make sure they pay for the energy they use."

Unverified model/legacy excerpt; not proof. AI summary (separate from source): This is the underlying promise, but it is a campaign pledge rather than evidence of delivery. It frames the claim and shows the intended action that would need later congressional follow-through.

unresolved same_term

An Economy for Everyone — Analilia Mejía for New Jersey
secondary · model gpt-5.4-mini · confidence 92%

Contest this evidence item

legacy_unverified · Source version not recorded · locator unknown

The House record shows that Analilia Mejia was sworn in as a Member of the House on April 20, 2026, and that she "is now a Member of the 119th Congress."

Unverified model/legacy excerpt; not proof. AI summary (separate from source): This confirms Mejia entered office within the lookback window, but it does not show any concrete action yet on Big Tech, AI data centers, or energy-cost accountability. The claim remains unfulfilled or at least unproven in the current window.

unresolved same_term

CREC-2026-04-20-pt1-PgH2979.pdf
primary · model gpt-5.4-mini · confidence 88%

Contest this evidence item

legacy_unverified · Source version not recorded · locator unknown

Rep. Mejia's official press-release index lists a September 1, 2026 release about joining the Congressional Black Caucus, followed by August releases on ICE detention and Medicaid. The visible recent items do not show an AI data-center, utility-bill, Big Tech, or energy-cost accountability action.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): Within the September 1-3 lookback, Mejia's own official news page shows activity, but not activity tied to the promised AI data-center moratorium or making Big Tech pay for energy costs. This keeps the promise unresolved rather than delivered.

unresolved same_term

Press Releases | Representative Analilia Mejia
secondary · model gpt-5.5 · confidence 82%

Contest this evidence item

legacy_unverified · Source version not recorded · locator unknown

GovInfo shows H.R. 9442, the Artificial Intelligence Data Center Moratorium Act, was introduced June 24, 2026 and referred to House Energy and Commerce and Foreign Affairs. The GovInfo record lists Ocasio-Cortez as sponsor and original cosponsors, but not Mejia; the bill text includes conditions that AI data centers not increase consumer utility or electricity bills and requires Energy Department public reports.

Unverified model/legacy excerpt; not proof. AI summary (separate from source): This is the clearest official federal vehicle matching Mejia's campaign pledge. The bill exists, but this official introduced-text record does not show Mejia as a sponsor or cosponsor and does not show enactment or completed accountability, so it does not establish delivery by Mejia.

unresolved same_term

H.R. 9442 (IH) - Artificial Intelligence Data Center Moratorium Act
secondary · model gpt-5.5 · confidence 78%

Contest this evidence item

Assessments

Public state: unverified As of unknown · legacy_unverified · . Original AI recommendation (not independently established): unresolved. same_term

Mejia entered Congress on April 20, 2026, so the promise is being judged during her current federal term. The evidence shows a closely related AI Data Center Moratorium Act was introduced in June 2026, but the official record identifies other sponsors and does not show Mejia as a sponsor, cosponsor, or material mover. Her recent official releases also do not show action on AI data centers, Big Tech energy-cost accountability, or utility-bill protections. Because she remains in office and the record does not establish either delivery or a serious failed attempt, the promise is unresolved rather than delivered or never.

provider codex_cli · model gpt-5.5 · confidence 84%

Public state: unverified As of unknown · legacy_unverified · . Original AI recommendation (not independently established): unresolved. same_term

Mejia was sworn into the 119th Congress on April 20, 2026, so the relevant federal office term has only recently begun. The available evidence establishes the campaign promise and her entry into office, but does not show that she has co-sponsored a moratorium, advanced legislation, used oversight authority, or otherwise held Big Tech accountable for AI data-center energy costs. Because there is not yet evidence of delivery or a failed serious attempt, the promise is best treated as unresolved rather than never fulfilled.

provider codex_cli · model gpt-5.5 · confidence 84%