I will support continued and increased investment in military construction projects in Hawaiʻi and the Indo-Pacific, including Red Hill water treatment, Pearl Harbor drydock construction, and related infrastructure.
Commitment kind: unknown. Promised action: not established. Promised outcome: not established. Deadline: unknown; not assumed expired.
Occurrences
including $1.7 billion of military construction projects in Hawaiʻi ... $141 million to commence a multi-year project to build a water treatment plant at Red Hill ... $553 million of additional funding to continue construction a new drydock at the Pearl Harbor Naval Shipyard
Case highlights and supports major military construction funding for Hawaiʻi and the Indo-Pacific, especially Red Hill remediation and Pearl Harbor drydock work.
unverified · Source version 110276 · locator unknown
Crews placed more than 900 cubic yards of concrete 40 to 60 feet underwater.
Unverified model/legacy excerpt; not proof. AI summary (separate from source): Within the lookback window, the Navy reported continued Pearl Harbor drydock construction, including underwater concrete placement, completed quay-wall and cofferdam pile driving, and supporting infrastructure foundations. This demonstrates implementation of continued investment, although the drydock remains under construction. The official release was verified through its syndicated reproduction.
unverified · Source version 110278 · locator unknown
Fiscal 2026 military construction (Navy) funds in the amount of $109,324,102 will be obligated at time of award
Unverified model/legacy excerpt; not proof. AI summary (separate from source): NAVFAC announced an August 11 award of a $309,650,002 construction contract for the Red Hill water treatment facility, with $109,324,102 in FY2026 funds obligated initially and remaining funding planned for future fiscal years. This establishes concrete investment beyond legislative authorization; it does not establish completion or independently attribute the award to Case.
I voted for our MilCon-VA FY 2027 measure because it advances our key military infrastructure worldwide
Fetched verbatim passage. AI summary (separate from source): Case documented voting for the FY2027 appropriations measure in committee and advocating approximately $1.7 billion in Hawaii projects. Proposed projects included $507 million for Pearl Harbor drydock replacement and $248 million for Red Hill water treatment. His statement explicitly said these projects required subsequent inclusion after detailed budget justifications arrived. This records concrete effort, with those proposed appropriations unresolved by this source.
unverified · Source version 110281 · locator unknown
DRY DOCK 3 REPLACEMENT 553,720 492,720
Unverified model/legacy excerpt; not proof. AI summary (separate from source): The enacted FY2026 NDAA authorized $492.720 million for Pearl Harbor Dry Dock 3 replacement and $141.650 million for the Joint Base Pearl Harbor-Hickam water treatment plant, alongside other Hawaii and Indo-Pacific military construction projects. These are enacted authorizations; they do not themselves prove appropriations, expenditures, or completed construction.
unverified · Source version 110283 · locator unknown
Case | Case | Democratic | HI | Yea
Unverified model/legacy excerpt; not proof. AI summary (separate from source): The official roll call records Case voting for the final FY2026 NDAA, which passed 312–112 and subsequently became Public Law 119-60. Read with the enacted construction table, this directly establishes his legislative support for the specified investments. The supplied payload does not identify the campaign or promise date, so delivery timing cannot be assigned confidently.