The Dakota Mainstem Water Supply Project Feasibility Study Act authorizes the Bureau of Reclamation to carry out a feasibility study for a proposed water project drawing from the Missouri River to supplement local supplies and address long-term water scarcity and quality challenges.
Require the Secretary of the Interior to conduct a feasibility study on the Dakota Mainstem Water Supply Project to supplement local supplies and address long-term water scarcity and quality challenges.
Occurrences
To direct the Secretary of the Interior to conduct studies to determine the feasibility of constructing projects to supply municipal, rural, and industrial water in certain parts of the Missouri River basin
Evidence
legacy_unverified · Source version not recorded · locator unknown
H.R.7331 was introduced by Dusty Johnson and referred to the House Committee on Natural Resources; the bill authorizes a Dakota Mainstem feasibility study and $10 million.
legacy_unverified · Source version not recorded · locator unknown
The House Natural Resources Water, Wildlife and Fisheries Subcommittee held a legislative hearing on H.R.7331 and listed Dusty Johnson as a witness.
Assessments
Dusty Johnson introduced H.R.7331 on February 3, 2026 to require the Interior Secretary to conduct the Dakota Mainstem feasibility study, and the House Natural Resources subcommittee held a legislative hearing on April 29, 2026. However, the available congressional record still shows the bill as introduced/referred rather than passed, enacted, or implemented by Interior. Because the 119th Congress term is still ongoing and Johnson has materially advanced the specific promised vehicle, this is pending rather than delivered or a final failure.