Seattle Harbor, WA ... Project Purpose: Funding is necessary to continue pre-construction engineering and design to include performing ship simulation and design refinement. ... Amount Requested: $2,330,000
Request $2,330,000 in FY2026 appropriations to continue pre-construction engineering and design for Seattle Harbor, including ship simulation and design refinement.
Occurrences
Evidence
The U.S. Army Corps of Engineers says the Seattle Harbor Navigation Improvement Project is eligible for congressional appropriation of design and construction, and that after appropriation the Corps and the Port of Seattle would engage in detailed design phases before project construction.
Assessments
The claim is specifically about whether Maria Cantwell requested $2,330,000 in FY2026 appropriations for Seattle Harbor pre-construction engineering and design. The provided official project material shows the project was eligible for future appropriations and still contingent on congressional funding, but it does not establish that Cantwell actually made the specific FY2026 request. Because the available record supports project eligibility but not the claimed request itself, the promise cannot be scored as delivered, partial, or never on the current evidence.