Kennedy Well Project
* Requested by: U.S. Senator Maria Cantwell
* Recipient Name: City of Ridgefield
* Amount Requested: $2,000,000
Unverified model/legacy excerpt; not proof. AI summary (separate from source): Cantwell's official FY2026 appropriations page lists a $2,000,000 request for Ridgefield's Kennedy Well Project, matching the commitment to request funds.
The City of Ridgefield will receive $1,092,000 for the Kennedy Well Project. The project will develop up to two new source wells
Fetched verbatim passage. AI summary (separate from source): Cantwell later announced Senate-passed FY2026 funding for the same Ridgefield project, but at $1,092,000 rather than the $2,000,000 requested.
unverified · Source version 64208 · locator unknown
WA City of Ridgefield for Kennedy Well Project 1,092,000 Perez Cantwell H
Unverified model/legacy excerpt; not proof. AI summary (separate from source): The Senate Appropriations public-law CDS table lists the Kennedy Well Project with Cantwell as a Senate requestor and a final amount of $1,092,000.
unverified · Source version 64198 · locator unknown
STAG—Drinking Water State Revolving Fund WA City of Ridgefield for Kennedy Well Project $1,092,000
Unverified model/legacy excerpt; not proof. AI summary (separate from source): EPA implementation guidance confirms the FY2026 community grant amount for Ridgefield's Kennedy Well Project as $1,092,000.
unverified · Source version 75871 · locator unknown
Public Law 119-74
Date Approved
January 23, 2026
Unverified model/legacy excerpt; not proof. AI summary (separate from source): GovInfo confirms the FY2026 appropriations act containing the Interior and Environment division became law on January 23, 2026.
unverified · Source version 75873 · locator unknown
WA City of Ridgefield for Kennedy Well
Project
1,092,000 Perez Cantwell H
Unverified model/legacy excerpt; not proof. AI summary (separate from source): The Senate Appropriations public-law CDS table lists Ridgefield's Kennedy Well Project with Cantwell as a Senate requestor and an enacted amount of $1,092,000, below the $2,000,000 request.
unverified · Source version 64192 · locator unknown
Kennedy Well Project
* Requested by: U.S. Senator Maria Cantwell, Washington state
* Recipient Name: City of Ridgefield
Unverified model/legacy excerpt; not proof. AI summary (separate from source): Cantwell's official FY2026 appropriations page lists the Kennedy Well Project for the City of Ridgefield as a request by Senator Cantwell; the same entry lists a $2,000,000 amount requested.
Fetched verbatim passage. AI summary (separate from source): Washington OMWBE's bid notice for Ridgefield's Kennedy Well shows the city moved into procurement/design work, with completion targeted for June 30, 2027.
current, and future water infrastructure projects, including the Eastside Elevated Water Reservoir, Kennedy Well, potential new wellfield
Fetched verbatim passage. AI summary (separate from source): Ridgefield's city news identifies Kennedy Well among current/future water infrastructure projects expected to add water production capacity, indicating implementation remained active rather than abandoned or reversed.
working through permitting for the Kennedy Well project after receiving a $1 million congressional grant
Fetched verbatim passage. AI summary (separate from source): Local reporting says Ridgefield was still working through permitting for Kennedy Well after receiving about $1 million in congressional funding, consistent with partial delivery and ongoing implementation.
unverified · Source version 87906 · locator unknown
GRAY AND OSBORNE INC 207 26248.00-3 Public Works 08.2026 Kennedy Well 22,126.60
GROUNDWATER SOLUTIONS INC. 2971 00727.002-7 Public Works 07.2026 Hydrological Study - Kennedy Water Rights 30,847.51
08.2026 Hydrological Study - Kennedy Water Rights 6,678.04
MESA PRODUCTS INC 4299 1189 Public Works Kennedy Farm Deep Monitor Well Extension 3,860.46
Unverified model/legacy excerpt; not proof. AI summary (separate from source): Within the lookback window, Ridgefield's October 8, 2026 council claims packet listed recent payments for Kennedy Well engineering, Kennedy water-rights hydrological work, and a Kennedy Farm deep monitor well extension, indicating the project remains active in implementation after the previously documented partial federal award.